Overall process;
automatic robotic load of varnish system (RF heater, varnish bath
& drying tower). Automatic unload of drying tower, automatic
robotic loading/unloading secondary operations, measurement system
& CNC lathes. Automatic change over of up to 35 different parts.
Operator can edit parameters (i.e. heat settings, part inspection
parameters, etc.) for all parts. Camera systems used to measure
and screen out defective parts before insertion into the CNC lathes.
Cell contains a rotor accumulator, robots, automatic measurement
systems, CNC lathes & secondary operation machines, several
camera systems for locating parts and/or inspecting them.